周玮

个人信息Personal Information

副教授

硕士生导师

性别:女

毕业院校:大连理工大学

学位:博士

所在单位:电气工程学院

学科:电力系统及其自动化

电子邮箱:zhouwei@dlut.edu.cn

扫描关注

论文成果

当前位置: 中文主页 >> 科学研究 >> 论文成果

A Multi-Objective Risk Scheduling Model of an Electrical Power System-Containing Wind Power Station with Wind and Energy Storage Integration

点击次数:

论文类型:期刊论文

发表时间:2019-06-01

发表刊物:ENERGIES

收录刊物:SCIE、EI

卷号:12

期号:11

ISSN号:1996-1073

关键字:wind power; risk; optimal operation; battery energy storage

摘要:The integrated operation of wind storage is a developmental trend for future wind power stations. Compared with energy storage and wind power system scheduling, the utilization ratio of wind power is improved. This paper analyzes the power system scheduling risks that are brought about by wind power stations with wind and energy storage integration and puts forward the corresponding risks indexes, which are based on the physical structure and the long-operation features of the battery energy storage system. This paper also proposes the multi-objective optimization scheduling model, considering the economy of optimization, risk of load-shedding, and wind power curtailment that is caused by the full failure and partial failure of energy storage and wind turbines, and the uncertainty of the wind power output. Example results have shown that the optimization scheduling model can apply to various control strategies and different risk levels of the system, and reduce the risk of an electric power system containing a wind power station with wind and energy storage integration. In the meantime, it can also improve the economical efficiency and utilization rate of the wind power system.