Feng Zhuo   

Associate Professor
Supervisor of Doctorate Candidates
Supervisor of Master's Candidates

MORE> Institutional Repository Personal Page
Language:English

Paper Publications

Title of Paper:The effects of concession period structures on BOT road contracts

Hits:

Date of Publication:2018-01-01

Journal:TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE

Included Journals:SCIE、EI、SSCI、Scopus

Volume:107

Page Number:106-125

ISSN No.:0965-8564

Key Words:BOT; Concession period structure; Road capacity; Road quality; Toll price; Concession period

Abstract:Under the build-operate-transfer (BOT) approach, the private firm builds and operates a road within the concession period and transfers the project at no cost to the government at the end of the concession period. Based on whether the construction period and the private operation period are defined together or separately, there are two concession period structures: single-period concession structure (SPCS) and two-period concession structure (TPCS). This paper simultaneously compares socially optimal toll prices in both private and public operation periods, road quality, and concession period under SPCS and TPCS, respectively. We find that if the marginal social welfare with respect to toll price in private operation period is sufficiently more responsive than to road quality, then the optimal road capacity and toll prices under SPCS are higher than those under TPCS. Otherwise if marginal social welfare in public operation period is sufficiently more responsive to road quality, then the optimal toll prices under SPCS are lower while the optimal road quality under SPCS is higher. We also find that the optimal concession periods are independent of concession period structures. This paper has made three extensions to further investigate the effects of concession period structures (1) when the toll price is determined by the private firm; (2) when renegotiation takes place; and (3) when government support policies are present. Based on our model results, this paper derives several policy implications regarding BOT road contract design under different concession period structures.

Address: No.2 Linggong Road, Ganjingzi District, Dalian City, Liaoning Province, P.R.C., 116024
Click:    MOBILE Version DALIAN UNIVERSITY OF TECHNOLOGY Login

Open time:..

The Last Update Time: ..