冯卓

个人信息Personal Information

副教授

博士生导师

硕士生导师

性别:男

毕业院校:天津大学

学位:博士

所在单位:创新与创业研究所

办公地点:大连理工大学经济管理学院D516室

联系方式:+86-411-84709310

电子邮箱:zhfeng@dlut.edu.cn

扫描关注

论文成果

当前位置: 中文主页 >> 科学研究 >> 论文成果

The effects of concession period structures on BOT road contracts

点击次数:

论文类型:期刊论文

发表时间:2018-01-01

发表刊物:TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE

收录刊物:SCIE、EI、SSCI、Scopus

卷号:107

页面范围:106-125

ISSN号:0965-8564

关键字:BOT; Concession period structure; Road capacity; Road quality; Toll price; Concession period

摘要:Under the build-operate-transfer (BOT) approach, the private firm builds and operates a road within the concession period and transfers the project at no cost to the government at the end of the concession period. Based on whether the construction period and the private operation period are defined together or separately, there are two concession period structures: single-period concession structure (SPCS) and two-period concession structure (TPCS). This paper simultaneously compares socially optimal toll prices in both private and public operation periods, road quality, and concession period under SPCS and TPCS, respectively. We find that if the marginal social welfare with respect to toll price in private operation period is sufficiently more responsive than to road quality, then the optimal road capacity and toll prices under SPCS are higher than those under TPCS. Otherwise if marginal social welfare in public operation period is sufficiently more responsive to road quality, then the optimal toll prices under SPCS are lower while the optimal road quality under SPCS is higher. We also find that the optimal concession periods are independent of concession period structures. This paper has made three extensions to further investigate the effects of concession period structures (1) when the toll price is determined by the private firm; (2) when renegotiation takes place; and (3) when government support policies are present. Based on our model results, this paper derives several policy implications regarding BOT road contract design under different concession period structures.