Scheduling the Hydropower System of a Municipal Power Grid Considering Multistage Congestion Problem

Hits:

Indexed by:会议论文

Date of Publication:2015-01-01

Included Journals:CPCI-S

Page Number:1932-1943

Key Words:Municipal Power Grid; Generation Scheduling; Electric Power Transmission Restrictions

Abstract:Southwestern China has experienced an imbalance growth between power supply and load demand for last decade. Meanwhile the construction of transmission lines is far behind the power supply growth. They together contribute to multistage congestion problem which threaten the reliability and stability of the power grid in wet season. This paper presents a method for coordinating the generation schedules of hydropower system of a municipal power grid. The objective is to maximize the total energy consumed on condition that ensuring the reliability and stability of the power grid. This is achieved by conceptualizing power grid as a diagraph based on the graph theory. Depth-First-Search (DFS) and transmission-line security checking are used to analyze topology relations of the power grid and flag overload transmission lines which violate the electric power transmission restrictions. A multistage congestion coordination strategy is introduced to iteratively coordinate the initial generation schedules of power supplies sharing overload transmission lines. The proposed method has been implemented to the hydropower system of Yunnan Power Grid in since 2014. The case results show that the method is feasible and practical.

Pre One:A Method for Hydropower System Peak Operation Relying on the Load Demands of Provincial Power Grid

Next One:基于专题任务的水电调度专业研究生培养模式探讨