- [1] Jin, Xiaoyu, 刘本希, 廖胜利, 程春田, 李钢, Liu, Lingjun.Impacts of different wind and solar power penetrations on cascade hydroplants operation[J],RENEWABLE ENERGY,2022,182:227-244
- [2] 刘本希, 廖胜利, 程春田, 武新宇.A Multi-Core Parallel Genetic Algorithm for the Long-Term Optimal Operation of Large-Scale Hydropower Systems[A],16th Annual World Environmental and Water Resources Congress of the Environmental-and-Water-Resources-Institute (EWRI),2022,220-230
- [3] 程春田, 刘本希, Chau, Kwok-Wing, 李刚, 廖胜利.China's small hydropower and its dispatching management[J],RENEWABLE SUSTAINABLE ENERGY REVIEWS,2022,42:43-55
- [4] 刘本希, Lund, Jay R., Liu, Lingjun, Liao, Shengli, 李刚, Cheng, Chuntian.Climate Change Impacts on Hydropower in Yunnan, China[J],Water,2022,12(1)
- [5] 刘本希, 廖胜利, 李秀峰.基于Web GIS的省地县一体化小水电管理系统设计与实施[J],水力发电,2022,3:56-60
- [6] 廖胜利, liujie, 刘本希, 程春田, 周凌安, 吴慧军.Multi-core parallel dynamic programming algorithm for short-term hydro-unit load dispatching of huge hydropower stations servering multiple power grids' load demands[J],WATER RESOURCES MANAGEMENT,2022,34(1)
- [7] 刘本希, Lund, Jay R., 廖胜利, Jin, Xiaoyu, Liu, Lingjun, 程春田.Optimal power peak shaving using hydropower to complement wind and solar power uncertainty[J],ENERGY CONVERSION AND MANAGEMENT,2022,209
- [8] 刘本希, Lund, Jay R., 廖胜利, Jin, Xiaoyu, Liu, Lingjun, 程春田.Peak Shaving Model for Coordinated Hydro-Wind-Solar System Serving Local and Multiple Receiving Power Grids via HVDC Transmission Lines[J],IEEE Access,2022,8:60689-60703
- [9] Liao, Shengli, Liu, Jie, Benxi, Cheng, Chuntian, Zhou, Lingan, Wu, Huijun, BX (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Linggong Rd 2, Dalian 116024, Peoples R China..Multicore Parallel Dynamic Programming Algorithm for Short-Term Hydro-Unit Load Dispatching of Huge Hydropower Stations Serving Multiple Power Grids[J],WATER RESOURCES MANAGEMENT,2020,34(1):359-376
- [10] Liu, Benxi, Cheng, Chuntian, Wang, Sen, Liao, Shengli, Chau, Kwok-Wing, Wu, Xinyu, Li, Weidong, SL (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Parallel chance-constrained dynamic programming for cascade hydropower system operation[J],ENERGY,2018,165:752-767
- [11] Liu, Benxi, Liao, Shengli, Chen, Fu, Li, Weidong, Cheng, Chuntian, SL (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Hydropower curtailment in Yunnan Province, southwestern China: Constraint analysis and suggestions[J],RENEWABLE ENERGY,2018,121:700-711
- [12] 刘本希, 廖胜利, 程春田, 李秀峰, 蔡华祥.基于决策树的大小水电长期协调调度模型及应用[J],水电能源科学,2016,05:60-64
- [13] Liu, Benxi, Liao, Shengli, Cheng, Chuntian, Wu, Xinyu.A Multi-Core Parallel Genetic Algorithm for the Long-Term Optimal Operation of Large-Scale Hydropower Systems[A],2016,220-230
- [14] 刘本希, 程春田, 李秀峰, 蔡华祥, 武新宇, Cheng, Chuntian(ctcheng@dlut.edu.cn).大小水电可消纳电量期望值最大短期协调优化调度模型[J],水利学报,2015,46(12):1497-1505
- [15] 刘本希, 廖胜利, 冯仲恺, 程春田, 李秀峰, 蔡华祥, Liao, Shengli.耦合偏互信息的贫资料地区小水电发电能力预测[J],电力系统自动化,2015,39(19):149-154
- [16] 程春田, 刘本希, 李刚, 廖胜利.Chinas small hydropower and its dispatching management[J],Renewable and Sustainable Energy Reviews,2015,42(3):43-55
- [17] 刘本希, 廖胜利, 程春田, 武新宇, Cheng, C.-T.(ctcheng@dlut.edu.cn).库群长期优化调度的多核并行禁忌遗传算法[J],水利学报,2012,43(11):1279-1286
|