赵珺

个人信息Personal Information

教授

博士生导师

硕士生导师

主要任职:科学技术研究院院长

性别:男

毕业院校:大连理工大学

学位:博士

所在单位:控制科学与工程学院

学科:控制理论与控制工程. 系统工程. 模式识别与智能系统

联系方式:0411-84707582

电子邮箱:zhaoj@dlut.edu.cn

扫描关注

论文成果

当前位置: 赵珺个人主页 >> 科学研究 >> 论文成果

A joint scheduling method for multiple byproduct gases in steel industry

点击次数:

论文类型:期刊论文

发表时间:2018-11-01

发表刊物:CONTROL ENGINEERING PRACTICE

收录刊物:SCIE

卷号:80

页面范围:174-184

ISSN号:0967-0661

关键字:Steel industry; Byproduct gases; Causal interval reasoning; Joint scheduling

摘要:Reasonable scheduling of the byproduct gases produced during steel making procedure is of significance to steel industry because it is helpful to save energy resources, raise economic profit, alleviate the environment pollution and ensure the safety of the production process. In this study, a causal-interval-reasoning (CIR)-based joint scheduling method is proposed for scheduling the multiple categories of byproduct gases. A causal reasoning model is constructed here to predict the gas tank level, in which not only a number of influence factors (i.e., the gas users) on the gas tanks but also the mutual influence of the online tanks are considered. The upper and lower limits of the prediction intervals (PIs) of each gas tank level are constructed based on the granularity partition of the samples and a particle swarm optimization is designed to determine the parameters of granularity. In order for the balance of the whole byproduct gas system, a four-layer causal network is established, in which the operational statuses of boilers, the heat quantity, the steam demand and the gas mixture proportion are all well involved. To further optimize the scheduling solutions, an evaluation index is accordingly proposed. The practical data coming from a steel plant are employed for the validation data experiments, and the human experience based approaches considering only one single category of gas are also conducted as comparable studies so as to indicate the superior performance of the proposed method. For the practical application, a scheduling software system is consequently developed and implemented based on the proposed method, which has been applied in this steel plant for more than 1 year.