的个人主页 http://faculty.dlut.edu.cn/1964011016/zh_CN/index.htm
点击次数:
论文类型:期刊论文
发表时间:2016-12-01
发表刊物:APPLIED MATHEMATICAL MODELLING
收录刊物:SCIE、EI、Scopus
卷号:40
期号:23-24
页面范围:10533-10548
ISSN号:0307-904X
关键字:Switched time-delay system; Multi-objective optimization; Convex
weighted sum; Normal boundary intersection; Fed-batch process
摘要:Maximization of productivity and minimization of consumption are two top priorities for biotechnological industry. In this paper, we model a fed-batch process as a nonlinear switched time-delay system. Taking the productivity of target product and the consumption rate of substrate as the objective functions, we present a multi-objective optimization problem involving the nonlinear switched time-delay system and subject to continuous state inequality constraints. To solve the multi-objective optimization problem, we first convert the problem into a sequence of single-objective optimization problems by using convex weighted sum and normal boundary intersection methods. A gradient-based single-objective solver incorporating constraint transcription technique is then developed to solve these single-objective optimization problems. Finally, a numerical example is provided to verify the effectiveness of the numerical solution approach. Numerical results show that the normal boundary intersection method in conjunction with the developed single-objective solver is more favourable than the convex weighted sum method. (C) 2016 Elsevier Inc. All rights reserved.