Hits:
Indexed by:期刊论文
Date of Publication:2017-08-01
Journal:ADVANCED ENGINEERING INFORMATICS
Included Journals:Scopus、SCIE、EI、SSCI
Volume:33
Page Number:164-180
ISSN No.:1474-0346
Key Words:Multi-objective optimization; Workspace; Productivity; Temporary structure (Scaffolding); Simulation; Multi-attribute utility
Abstract:Construction trades need to share temporary structures to increase the output of direct work while controlling the labor input of indirect work. The purpose of this research is to develop a framework to determine the optimal location of temporary structures in a computerized practical manner for piping construction projects. Based on the spatial relationship between work envelope and scaffolding placement requirements, this paper presents the optimization model in two phases: the simulation-based optimization model and a multi-attribute utility (MAU) based alternative selection model. A multi objective optimization model is established to improve scaffolding availability among multiple activities while maximizing piping crew productivity. The multi-attribute utility model is employed to handle the uncertainty of the assessment weights on the attributes to illustrate the preference of decision makers among different scaffolding placement alternatives obtained from the first phase. The approach was validated in a piping module, which provided superintendents and space planners with an effective decision-making tool among possible scaffolding alternatives in piping construction. The proposed optimization technique is an alternative methodology for solving the productivity-tasks-scaffolding trade-off problem, which further revolutionizes the spatial coordination process of workspace management and temporary structure planning. (C) 2017 Elsevier Ltd. All rights reserved.