Multiobjective Optimization for Scaffolding Space Planning in Industrial Piping Construction Using Model-Based Simulation Programming

Hits:

Indexed by:Journal Papers

Date of Publication:2020-01-01

Journal:JOURNAL OF COMPUTING IN CIVIL ENGINEERING

Included Journals:EI、SCIE

Volume:34

Issue:1

ISSN No.:0887-3801

Key Words:Workspace; Scaffolding system; Productivity; Resource allocation; Multiobjective optimization

Abstract:As the main type of temporary structures, scaffolding systems have a significant impact on labor productivity and project cost in construction, but the ability to provide space planning assistance for construction planners is limited. This research developed a framework for resource allocation and space planning of scaffolding systems. A workspace-based multiobjective model is proposed to simultaneously optimize the number of supported tasks, labor piping productivity, and scaffolding labor input for mechanical piping construction. With the input data of scaffolding placement rules and task information from 3D models, the simulation-based approach effectively searches for the Pareto-optimal solutions. Further, analyzing procedure also assists the planners with final decision-making. As a validation, the applicability and effectiveness of the proposed model were tested through an example based on a 3D piping model. This study makes a contribution to the body of knowledge by proposing an improved scaffolding planning model from workspace perspective, which is capable of improving the overall performance of practical scaffolding planning in the preconstruction period.

Pre One:基于IFQFD的海底隧道施工风险因素排序

Next One:Short-term load forecasting based on multivariate time series prediction and weighted neural network with random weights and kernels