Construction Controls for a Half-Through Tied Arch Bridge in China

Release Time:2019-03-09  Hits:

Indexed by: Journal Article

Date of Publication: 2014-11-01

Journal: STRUCTURAL ENGINEERING INTERNATIONAL

Included Journals: Scopus、EI、SCIE

Volume: 24

Issue: 4

Page Number: 557-561

ISSN: 1016-8664

Key Words: composite beam; erection elevation; installation gaps; suspender force; temperature effect

Abstract: Based on the half-through tied arch bridge, Deng-jia-yao Bridge in Beijing, a three-dimensional finite element model (FEM) including construction stages is established. The measured values are in good agreement with the finite element results of the final suspender force and bridge elevation. This article summarizes two technical difficulties: the erection elevation of the transverse beams and the effect of temperature on the suspender tension force during construction. The focus is on the precise installation gaps between transverse beams and steel pads. The results show that the reactions of the temporary steel pipe piles are sensitive to the installation gaps. Analysis of the suspender force during the first tensioning of suspenders indicates that the final suspender force cannot be reached if the effect of temperature on the suspender force is ignored.

Prev One:Effects of Exponentially Modified Sinusoidal Oscillation and Amplitude on Bridge Deck Flutter Derivatives

Next One:预应力混凝土桥墩动力开裂特性分析