个人信息Personal Information
教授
博士生导师
硕士生导师
性别:男
毕业院校:东北大学
学位:博士
所在单位:控制科学与工程学院
学科:控制理论与控制工程. 系统工程
办公地点:电信学部大黑楼A0612房间
联系方式:Tel:0411-84707580
电子邮箱:wangwei@dlut.edu.cn
A joint scheduling method for multiple byproduct gases in steel industry
点击次数:
论文类型:期刊论文
发表时间:2018-11-01
发表刊物:CONTROL ENGINEERING PRACTICE
收录刊物:SCIE
卷号:80
页面范围:174-184
ISSN号:0967-0661
关键字:Steel industry; Byproduct gases; Causal interval reasoning; Joint scheduling
摘要:Reasonable scheduling of the byproduct gases produced during steel making procedure is of significance to steel industry because it is helpful to save energy resources, raise economic profit, alleviate the environment pollution and ensure the safety of the production process. In this study, a causal-interval-reasoning (CIR)-based joint scheduling method is proposed for scheduling the multiple categories of byproduct gases. A causal reasoning model is constructed here to predict the gas tank level, in which not only a number of influence factors (i.e., the gas users) on the gas tanks but also the mutual influence of the online tanks are considered. The upper and lower limits of the prediction intervals (PIs) of each gas tank level are constructed based on the granularity partition of the samples and a particle swarm optimization is designed to determine the parameters of granularity. In order for the balance of the whole byproduct gas system, a four-layer causal network is established, in which the operational statuses of boilers, the heat quantity, the steam demand and the gas mixture proportion are all well involved. To further optimize the scheduling solutions, an evaluation index is accordingly proposed. The practical data coming from a steel plant are employed for the validation data experiments, and the human experience based approaches considering only one single category of gas are also conducted as comparable studies so as to indicate the superior performance of the proposed method. For the practical application, a scheduling software system is consequently developed and implemented based on the proposed method, which has been applied in this steel plant for more than 1 year.