Abstract: To establish earth pressure control model aiming at chamber pressure
balance, a method of combining mechanism analysis and least squares
support vector machine ( LS-SVM) technology was proposed. Firstly, the
tunneling process mechanism of earth pressure balance (EPB) shield was
analyzed, and an earth pressure control model of pressure chamber was
established based on continuity equation, mechanics balance equation and
so on. For the total thrust of shield, speeds of shield jack and screw
conveyor influencing to the chamber earth pressure were quitely
different, a weighting coefficient y was introduced. Secondly, an error
model from sampling data was established for obtaining optimal y by
means of LS-SVM. Finally, the simulations were given to illustrate the
effectiveness of the earth pressure control model