邵诚

个人信息Personal Information

教授

博士生导师

硕士生导师

性别:男

毕业院校:东北大学

学位:博士

所在单位:控制科学与工程学院

学科:控制理论与控制工程. 运筹学与控制论

办公地点:创新园大厦A座722室

电子邮箱:cshao@dlut.edu.cn

扫描关注

论文成果

当前位置: 中文主页 >> 科学研究 >> 论文成果

盾构机密封舱土压平衡综合优化控制

点击次数:

发表时间:2013-01-01

发表刊物:大连理工大学学报

期号:3

页面范围:447-454

ISSN号:1000-8608

摘要:In order to control the earth pressure balance (EPB) of pressure chamber more accurately and efficiently during tunneling process ,an integrated optimization control method is proposed for cutter head system ,thrust system and discharge system .A stratum identification system is designed which takes the torque penetration index (TPI) and field penetration index (FPI) as input character parameters .An expert control system is established ,and it can give the control strategy of cutter speed based on the quantitative results of stratum identification and control rules .On this basis ,a least squares-support vector machine (LS-SVM ) nonlinear predictive control strategy is given to coordinatively control advance speed and screw conveyor speed , and the control variables can be rollingly optimized by means of ant colony system (ACS) algorithm .The experiments show that the earth pressure balance in chamber can be controlled very well even though the working condition changes ,which demonstrates the effectiveness of this method and the earth pressure balance in chamber can be realized by multiple subsystems coordinative optimization control .

备注:新增回溯数据