85hQLdQQ2HTxBWZ5vNv1ADV8tI6Jt51e9C3BhA7hsw2O36fR8HG4nSYUcVUz
Current position: Home >> Scientific Research >> Paper Publications

Algorithm of Crane Selection for Heavy Lifts

Release Time:2019-03-09  Hits:

Indexed by: Journal Article

Date of Publication: 2011-01-01

Journal: JOURNAL OF COMPUTING IN CIVIL ENGINEERING

Included Journals: SCIE、Scopus

Volume: 25

Issue: 1

Page Number: 57-65

ISSN: 0887-3801

Key Words: Crane selection; Heavy lift; Ground bearing pressure; Mobile crane; CAD

Abstract: Lifting capacity charts are tabulated and provided to operators and practitioners by mobile crane manufacturers. These charts are structured based on predetermined crane configurations, which consist of boom/jib length, lifting radius, main boom angle to ground, and jib angle to ground or its offset to its main boom centerline. It is a tedious job that lifting planners select cranes for construction projects based on a large number of lifting capacity charts. This paper presents a newly developed algorithm for selecting mobile cranes on construction sites, which takes into account the lifting capacity, the geometrical characteristics of the crane, the dimensions of equipments and riggings, and the ground bearing pressure. The algorithm is incorporated into a three-dimensional (3D) computer-aided system that integrates crane selection module, crane modeling module, 3D-simulation module, 3D computer-aided design modeling module, rigging calculation module, and data management module. At last, a case is represented in order to demonstrate the use of the developed algorithm and to illustrate its essential features.

Prev One:Collision-Free Path Planning For Mobile Cranes Based On Ant Colony Algorithm

Next One:bauma China 2010展会上的履带起重机