location: Current position: Home >> Scientific Research >> Paper Publications

Multiple project scheduling based on an improved hybrid genetic algorithm

Hits:

Indexed by:会议论文

Date of Publication:2010-12-04

Included Journals:EI、Scopus

Page Number:351-354

Abstract:This paper proposes a hybrid genetic algorithm to solve the resource-constrained multiple project scheduling problem. Objective described in this paper is to minimize total project time. The paper firstly analyses multi-task of many resources in a group of projects, and sets up the mathematics model. Then it brings an improved genetic algorithm, and changes the problem into the chromosome or the sequence of genes with the corresponding priority. The corresponding algorithm is proposed to optimize the objective of time. Finally, this paper gives an example to show the application. ? 2010 IEEE.

Pre One:Analysis on Urban-rural Land Displacement Mechanism Based on Sustainable Development

Next One:Research on project management mode selection and project organization design of manufacturing enterprise