贡金鑫

个人信息Personal Information

教授

博士生导师

硕士生导师

性别:男

毕业院校:大连理工大学

学位:博士

所在单位:土木工程系

学科:结构工程. 桥梁与隧道工程. 港口、海岸及近海工程

办公地点:结构实验室

联系方式:jinxingong@163.com

电子邮箱:gongjx@dlut.edu.cn

扫描关注

论文成果

当前位置: 中文主页 >> 科学研究 >> 论文成果

Degradation of bond between steel bar and freeze-thaw concrete after electrochemical chloride extraction

点击次数:

论文类型:期刊论文

发表时间:2010-04-01

发表刊物:JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY

收录刊物:SCIE、EI

卷号:17

期号:2

页面范围:388-393

ISSN号:1005-9784

关键字:concrete; bond strength; degradation; electrochemical chloride extraction; freeze-thaw cycles

摘要:The effect of electrochemical chloride extraction (ECE) on bond strength between steel bar and freeze-thaw concrete contaminated by chloride was experimentally investigated for beam specimens with dimensions of 100 mmx100 mmx400 mm. During the experiment, 3% NaCl (vs mass of cement, mass fraction) was mixed into concrete to simulate chloride contamination, and the specimens experienced 0, 25, 50, 75 freeze-thaw cycles before ECE. In the process of ECE, different current densities and durations were adopted. It is indicated that the bond strength between reinforcement and concrete decreases with the increase of freeze-thaw cycles; the more the current and the electric quantity of ECE are, the more the loss of bond strength is; and the largest loss is up to 58.7%. So, it is important to choose proper parameters of ECE for the reinforced concrete structures contaminated by chloride and subjected to freeze-thaw cycles.