个人信息Personal Information
教授
博士生导师
硕士生导师
主要任职:President of international exchange committee of the Chinese Society of Rock Mechanics and Engineering CSRME
其他任职:国际岩石力学与岩石工程学会(ISRM)中国国家小组副主席
性别:男
毕业院校:东北大学
学位:博士
所在单位:土木工程系
办公地点:综合实验四号楼330
联系方式:tca@mail.neu.edu.cn
基于微震监测的大岗山水电站高拱坝廊道裂缝形成原因研究
点击次数:
发表时间:2022-10-10
发表刊物:岩石力学与工程学报
所属单位:建设工程学部
卷号:37
期号:07
页面范围:1608-1617
ISSN号:1000-6915
摘要:Multiple deep cracks appeared at the top arch of galleries in Dagangshan high arch dam before the impoundment. Cracking characteristic around the access gallery at E.L. 979 m,foundation gallery at E.L. 940 m and drainage gallery at E.L. 937 m before and after the impoundment was analyzed using the installed microseismic monitoring system in the high arch dam. The process of crack inducement was reproduced and the real cause of cracking in galleries was studied. The results show that the microseismic activities in galleries are significantly coherent to the water level. Before the impoundment,the microseismicity of the gallery top arch of dam heel area was strong which exceeds its cracking limit,thus inducing gallery cracks in the cross sections of river. After the impoundment,with the rising of water level,the gallery cracks in the area of arch dam heel tends to be stable while galleries in arch dam toe area tend to crack. The trend of the cracking which transferrs from the dam heel area to the dam toe aera during the impoundment process was revealed. It is recommended to keep a close eye on the damage conditions of concrete in arch dam toe area during the impoundment period. © 2018, Science Press. All right reserved.
备注:新增回溯数据