唐春安

个人信息Personal Information

教授

博士生导师

硕士生导师

主要任职:President of international exchange committee of the Chinese Society of Rock Mechanics and Engineering CSRME

其他任职:国际岩石力学与岩石工程学会(ISRM)中国国家小组副主席

性别:男

毕业院校:东北大学

学位:博士

所在单位:土木工程系

办公地点:综合实验四号楼330

联系方式:tca@mail.neu.edu.cn

扫描关注

论文成果

当前位置: 中文主页 >> 科学研究 >> 论文成果

基于微震监测与数值模拟的大岗山右岸边坡抗剪洞加固效果分析

点击次数:

发表时间:2022-10-10

发表刊物:岩石力学与工程学报

所属单位:建设工程学部

期号:6

页面范围:1239-1247

ISSN号:1000-6915

摘要:The right bank slope of Dagangshan hydropower station is steep and high, characterized by high in-situ stress. The geological defects in this project include diabase dikes, dense belts of unloading fissures and faults moderately dipping outside slope, which attribute to the poor rock mass quality. In addition, several sets of macrocracks were observed during excavation, which greatly threatened the slope stability unexpectedly. In this paper, the microseismic monitoring technology is employed in combination of numerical simulations, i.e. the software RFPA3D. The RFPA3D can consider the constitutive relationship of quasi-brittle materials such as rocks. Consequently, slope stabilities with and without anti-shear gallery are conducted. Also, the potential sliding surface of slope failure is determined by microseismic events of rock mass spatial damages during slope excavation. The results confirm the rationality of anti-shear gallery. It is found that the shear resistance against sliding of the structured rock mass increases significantly after concrete replacement in anti-shear gallery. The monthly microseismic events were reduced by 66.4% after application of anti-shear gallery, and the factor of safety of slope increases by 51.2%. However, owing to the complex slope structures, the possibility of local instability still exists in the process of slope excavation. Therefore, it is suggested to lockup shearing outlet in the construction progress, and to monitor the microfracturing of rock mass where the anti-shear gallery did not pass through. The rock deformation at the junction between the unloading fissure XL-316 and fault f231 should be observed in the later stage when pouring concrete is performed on the dam.

备注:新增回溯数据