徐斌

个人信息Personal Information

教授

博士生导师

硕士生导师

任职 : 工程抗震研究所副所长

性别:男

毕业院校:大连理工大学

学位:博士

所在单位:水利工程系

学科:水工结构工程. 防灾减灾工程及防护工程. 岩土工程

办公地点:辽宁省大连市高新园区大连理工大学四号实验楼101

联系方式:xubin@dlut.edu.cn

电子邮箱:xubin@dlut.edu.cn

扫描关注

论文成果

当前位置: 徐斌 >> 科学研究 >> 论文成果

高土石坝坝坡地震稳定分析研究

点击次数:

发表时间:2012-01-01

发表刊物:岩土工程学报

所属单位:建设工程学部

卷号:34

期号:1

页面范围:139-144

ISSN号:1000-4548

摘要:By using the dynamic finite element stability and deformation method,the
   definite methods for the most dangerous sliding surface,the influences
   of seismic duration and depth of sliding surface on slope stability and
   deformation as well as the reinforcement range of dam slopes are
   studied.The results show that by means of the pseudo-static method,the
   slip circle corresponding to the minimum safety factor is deeper and the
   slip range is larger owing to the fact that the acceleration
   distribution coefficient suggested by the Chinese Code does not match
   the seismic response of dams.It is not helpful for determining the
   reinforcement range of dam slopes.During the earthquake history,the
   potential sliding surface varies with the time history,and it should be
   arbitrarily searched by using the dynamic finite element method.The
   potential sliding surface corresponding to the minimum safety factor is
   different from the maximum slippage.The estimation of the stability
   safety of dam slopes should combine the safety factor with the
   deformation.The reinforcement range of dam slopes is suggested according
   to the calculated results.

备注:新增回溯数据