Hits:
Indexed by:会议论文
Date of Publication:2017-01-01
Included Journals:CPCI-S
Volume:107
Page Number:299-303
Key Words:Rescheduling; Non-complete-trust; PSO; Neighborhood search
Abstract:Aiming at the problem of the two stage supply chain disruption in the JIT production system, this paper first puts forward a disruption management rescheduling model based on non-complete-trust, with cash compensation negotiation mechanism. The time of delivery and the amount of cash compensation as coordinate transmission information, using feedback - consultation mechanisms to solve the information privatization problem. Second, based on the algorithm combination of particle swarm optimization (PSO) and the neighborhood search mechanism, and with examples to verify the negotiation mechanism proposed in this paper can effectively reduce the cost caused by disruption.