Dynamic Scheduling Method Based on Multi-Agent for Cold Rolling Whole Line

Hits:

Indexed by:会议论文

Date of Publication:2013-07-26

Included Journals:EI、CPCI-S、Scopus

Page Number:8082-8087

Key Words:Cold Rolling; Planning and Scheduling; Multi-Agent; Ant Colony Optimization

Abstract:The production process of cold rolling plant is very complicated due to its long production flow, a large number of product categories and machines. The static production planning is usually difficult to be repeatedly assigned when some unexpected circumstances occur, for example machine malfunction, material delay and etc. In this study, a distributed dynamic scheduling method based on multi-agent is established for solving the rescheduling problem of cold rolling line, in which a dynamic reconfiguration method of the production flow is further studied to realize the balance of machine yields ability and load. For solving the established model, an ant colony optimization based on dynamic constraints is proposed. The practical experiments with real data of Shanghai BaoSteel Co. Ltd demonstrate that the proposed method is effective to the production rescheduling of cold rolling line.

Pre One:Bayesian neural networks based pipeline pressure prediction for steam system in steel industry

Next One:Prediction Intervals for a Noisy Nonlinear Time Series Based on a Bootstrapping Reservoir Computing Network Ensemble