DALIAN UNIVERSITY OF TECHNOLOGY
Login
中文
Home
Scientific Research
Research Projects
Published Books
Patents
Paper Publications
Research Field
Teaching Research
Teaching Achievement
Teaching Information
Teaching Resources
Awards and Honours
Other Rewards
Academic Honor
Scientific Awards
Enrollment Information
Student Information
My Album
Blog
Current position:
Home
>>
Scientific Research
>>
Paper Publications
廖胜利
Personal Information
Associate Professor Supervisor of Doctorate Candidates Supervisor of Master's Candidates
Paper Publications
[11]Wang, Jiayang, Cheng, Chuntian, Liu, Benxi, Liao, Shengli.MILP Model for Short-Term Hydro Scheduling with Head-Sensitive Prohibited Operating Zones[A],2017,500-510
[12]Liao, Sheng-Li, Sun, Qian-Ying, Li, Zhi-Fu, Gang, SL (reprint author), Dalian Univ Technol, Inst Hydropower Syst & Hydroinformat, Dalian 116024, Peoples R China..Real-time correction of antecedent precipitation for the Xinanjiang model using the genetic alg...[J],JOURNAL OF HYDROINFORMATICS,2016,18(5):803-815
[13]刘本希, 廖胜利, 程春田, 李秀峰, 蔡华祥.基于决策树的大小水电长期协调调度模型及应用[J],水电能源科学,2016,05:60-64
[14]过团挺, 曹璐, 廖胜利.基于弃水风险率控制的水库预泄调度方法[J],水利水电技术,2016,47(4):88-92
[15]廖胜利, 程春田.Multi-core parallel genetic algorithm with tabu strategy for rainfall-runoff model calibration[J],Journal of Hydrologic Engineering-ASCE,2016,40(5):1700-1710
[16]Liu, Benxi, Wu, Xinyu, Cheng, Chuntian, Liao, Shengli.A Multi-Core Parallel Genetic Algorithm for the Long-Term Optimal Operation of Large-Scale Hydr...[A],2016,220-230
[17]冯仲恺, 程春田, 牛文静, 廖胜利, 申建建, Cheng, Chuntian(ctcheng@dlut.edu.cn).均匀动态规划方法及其在水电系统优化调度中的应用[J],水利学报,2015,46(12):1487-1496
[18]Liao, Shengli, Li, Zhifu, Gang, Wang, Jiayang, Wu, Xinyu, G (reprint author), Dalian Univ Technol, Inst Hydropower Syst & Hydroinformat, Dalian 116024, Peoples R China..Modeling and Optimization of the Medium-Term Units Commitment of Thermal Power[J],ENERGIES,2015,8(11):12848-12864
[19]刘本希, 廖胜利, 冯仲恺, 程春田, 李秀峰, 蔡华祥, Liao, Shengli.耦合偏互信息的贫资料地区小水电发电能力预测[J],电力系统自动化,2015,39(19):149-154
[20]冯仲恺, 廖胜利, 牛文静, 程春田, 唐建兴, 苏华英.梯级水电站群中长期优化调度的正交离散微分动态规划方法[J],中国电机工程学报,2015,35(18):4635-4644
total62 2/7
first
previous
next
last
Page