Hits:
Indexed by:会议论文
Date of Publication:2017-01-01
Included Journals:SCIE、CPCI-S
Volume:105
Page Number:908-915
Key Words:Tunnel boring machine; Cutter mount; New welding structure; Finite element analysis
Abstract:TBM (Tunnel Boring Machine) has become a main technical means for the tunnel construction of rock condition. Cutter mount is an important welding structure on TBM cutter-head and it is the most dangerous positions to occur fatigue failure in the project. According to the characteristics that welding position of TBM cutter mount is easy to result in the fatigue fracture; a new cutter mount welding structure was designed on the basis of the damage positions of the cutter mount in practical engineering and the theory of welding structure design. Reduced-scale simplified models of existing service cutter mount welding structures and new cutter mount welding structure were established. Then, finite element analyses of the two reduced-scale simplified models were carried out and the results of finite element analysis for two kinds of reduced-scale simplified models were compared. The result shows that the area of compressive stress distribution of the new structure weld zone is larger than that of the existing service structure, the residual tensile stress is not conducive to the improvement of the fatigue performance of the structure and the compressive stress is favorable. Therefore, the new welding structure can effectively improve the fatigue performance of TBM cutter mount.