个人信息Personal Information
教授
博士生导师
硕士生导师
性别:男
毕业院校:哈尔滨建筑大学
学位:博士
所在单位:建设管理系
学科:工程管理. 管理科学与工程. 项目管理
Lean Precast Production System based on the CONWIP Method
点击次数:
论文类型:期刊论文
发表时间:2018-07-01
发表刊物:KSCE JOURNAL OF CIVIL ENGINEERING
收录刊物:SCIE、Scopus
卷号:22
期号:7
页面范围:2167-2177
ISSN号:1226-7988
关键字:prefabrication; lean production; precast production; simulation; CONWIP
摘要:To enhance the level of precast production management, and to reduce the costs of precast production, a lean precast production system is developed based on the constant work-in-process (CONWIP) method. Then the performance of this system is verified using the Discrete Event Simulation (DES). A quantitative performance evaluation between the lean precast production system and the current precast production process is provided using the JaamSim simulation platform. Cases and site visits to precast concrete plant in China are combined to collect the production procedures and initial parameters involved in precast production. Through simulations, Non-value Adding (NVA) activities, as well as bottleneck workstations, are identified in precast production. The optimal number of cards to be used in the lean precast production system is also presented. Our simulation experiments show that the lean precast production system provides an effective way to control queue length and shorten the WIP and cycle time, while also maintaining throughput and saving 25.4% of labour cost.