李忠富

个人信息Personal Information

教授

博士生导师

硕士生导师

性别:男

毕业院校:哈尔滨建筑大学

学位:博士

所在单位:建设管理系

学科:工程管理. 管理科学与工程. 项目管理

扫描关注

论文成果

当前位置: 大工 李忠富 主页 >> 科学研究 >> 论文成果

Modular and Offsite Construction of Piping: Current Barriers and Route

点击次数:

论文类型:期刊论文

发表时间:2017-06-01

发表刊物:APPLIED SCIENCES-BASEL

收录刊物:SCIE

卷号:7

期号:6

ISSN号:2076-3417

关键字:modular and offsite construction; piping prefabrication; building information modelling; challenges; route

摘要:To investigate current practices and identify challenges of piping prefabrication, this paper conducts a comprehensive survey to mechanical, electrical, and plumbing (MEP) contractors. This paper is performed in three main steps. First, the current state of piping prefabrication, the attitude of MEP contractors to piping prefabrication, and the challenges of piping prefabrication are identified through a comprehensive data collection process that included semi-structured interviews, case studies, site visits, and questionnaires. The second step included suggesting a pattern and roadway of piping prefabrication. The results showed that: (1) The attitudes to feasibility of piping prefabrication differ in piping systems, piping connector modes, and types of project; and (2) building information modelling (BIM) promotes the adoption of piping prefabrication. Integrated project delivery (IPD), and distributor's early involvement into projects have significant effects on the successful implementation of piping prefabrication. (3) The main barriers and challenges were identified including the low level of standardization of design, lack of preferential policy, economies of scale, low-skilled workers, as well as the availability of fittings and valves. In the final step, a four-phase route of piping prefabrication is suggested for MEP contractors to expand the prefabrication capacity incrementally. The main contributions of this paper include: (1) This paper proposes a route for MEP contractors to improve their piping construction through the Modular and offsite construction (MOC) method. (2) This paper finds that the level of feasibility of piping prefabrication differs in piping systems, connection modes, and types of project. Challenges and barriers of piping prefabrication are firstly identified.