![]() |
个人信息Personal Information
教授
博士生导师
硕士生导师
性别:男
毕业院校:哈尔滨建筑大学
学位:博士
所在单位:建设管理系
学科:工程管理. 管理科学与工程. 项目管理
利用排队论确定挖土机数量及其在BIM中的应用
点击次数:
发表时间:2022-10-04
发表刊物:工程管理学报
期号:5
页面范围:109-113
ISSN号:1674-8859
摘要:Earthwork construction engineering is an essential part in many engineering projects,thus it is very important to optimize the regulation scheme of the construction vehicle. The paper introduces the queuing theory model,and its impact on the optimized scheme of the allocation of the construction vehicle in the pit engineering. Based on the queuing theory,algorithm can be established to determine the most reasonable number of the excavator in the earthwork construction engineering using Matlab. At the same time,this paper also describes the theoretical sources and the advantages of the construction simulation,and explains the specific steps to carry out the simulation of construction process with the data from the queuing theory model and some BIM software. The time parameter of the every truck's working condition calculated by the queuing theory can be used to enrich the BIM model,thus every truck's Animation in the navisworks can be more precise and complete. The simulation animation exported can become more real,and is more likely to correspond to the reality. The relationship between the numerical calculation software and the building operation software indicates the information integration in the process of the simulation of the construction. The research results have extensive application value and can be meaningful in many areas such as the civil engineering management or teaching in university.
备注:新增回溯数据