Indexed by:期刊论文
Date of Publication:2022-06-29
Journal:压力容器
Affiliation of Author(s):化工学院
Volume:34
Issue:11
Page Number:28-33,40
ISSN No.:1001-4837
Abstract:Face up the leakage problems of large size non-standard vessel flange under action of axial force in industry,the corresponding experimental apparatus was set up and the change rules of bolt load,internal pressure and leak rate under different preload,initial pressure and loading schemes were studied.The test results indicated that the modified loading scheme based on ASME PCC-1 and JIS B 2251 was still optimized when applied to this structural form flange,the bolt load uniformity was the best and loading number was the least based on JIS B 2251 loading scheme.When the initial pressure was 200 kPa and 800 kPa,the increase of preload was difficult to reduce the maximum leakage rate of inner flange,when the initial pressure was 400 kPa and 600 kPa,the preload was increased from 6.0 kN to 9.0 kN,the max imum leakage rate decreased by 30.4% and 18.2%.
Note:新增回溯数据
Engineer
Gender:Male
Alma Mater:大连理工大学
Degree:Doctoral Degree
School/Department:化工学院
Discipline:Chemical Process Equipment. Safety Science and Engineering
Business Address:大连理工大学西校区H509
Contact Information:13478665105
Open time:..
The Last Update Time:..