已经得到个称赞     给我点赞
  • 教师姓名:李宏
  • 性别:
  • 主要任职:Professor/Ph. D & Master Supervisor
  • 电子邮箱:Hong.Li@dlut.edu.cn
  • 职称:教授
  • 所在单位:土木工程系
  • 学位:博士
  • 学科:岩土工程
  • 毕业院校:东北大学
  • 办公地点:辽宁省大连市甘井子区凌工路2号 大连理工大学 建设工程学部 土木工程学院 岩石破裂与失稳研究所 三号综合实验楼 417-1房间
  • 联系方式:手机: 138-89472105 E-mail: hong.li@dlut.edu.cn; 13889472105@163.com
论文成果
当前位置: 中文主页 >> 科学研究 >> 论文成果 >> Optimal design of... >>同专业硕导
Optimal design of micro-seismic monitoring array and seismic source location estimation for rock slope
  • 点击次数:
  • 论文类型:期刊论文
  • 发表时间:2011-06-01
  • 发表刊物:Open Civil Engineering Journal
  • 收录刊物:EI、Scopus
  • 卷号:5
  • 期号:1
  • 页面范围:36-45
  • ISSN号:18741495
  • 摘要:For the purpose of getting a better understanding on failure mechanism of rock fracturing due to construction perturbation inside the rock slope at the right bank of Dagangshan Hydropower Station, southwest of China, a highprecision microseismic monitoring system was installed and source location data has preliminarily been investigated. The optimal design of microseismic monitoring network, especially the sensor array was investigate based on P method and Powell algorithm. The positioning accuracy of the system has been adjusted according to the artificial fixed blasting tests. The testing results show that the error in localizing microseismic source is less than 10 m within the scope of the sensor array, indicating that the positioning accuracy for the monitoring system deployed at the right bank slope is high. Signals from 255 microseismic events with moment magnitude ranging from -1.8 to -0.4 were recorded during the 2-month monitoring period. The cluster distribution of microseismic events such as the concentration of microseismicity inside the drainage tunnel at 1081 m level can directly reflect the construction progress. The present study has significantly improved the understanding of the characteristics of the failure associated with excavation inside the rock slope. It will greatly benefit the prediction on potential sliding areas and support to prevent hazards during construction phases. ? Xu et al.
  • 发表时间:2011-06-01