He Guo

Professor   Supervisor of Doctorate Candidates   Supervisor of Master's Candidates

Gender:Male

Alma Mater:大连理工大学

Degree:Master's Degree

School/Department:软件学院、国际信息与软件学院

Contact Information:guohe@dlut.edu.cn

E-Mail:guohe@dlut.edu.cn


Paper Publications

Complexity of problem TF2|v=1, c=2|Cmax

Hits:

Indexed by:期刊论文

Date of Publication:2016-01-01

Journal:Information Processing Letters

Included Journals:EI

Volume:116

Issue:1

Page Number:65-69

Abstract:In this paper, we study a flow shop scheduling problem with an interstage transporter, in which there are a set of n jobs, two machines A and B, and one transporter located at machine A initially. Each job has to be processed on machine A first, then transported by a vehicle to machine B, finally processed on machine B. The interstage transporter can carry at most two jobs between the machines at a time. When the transporter carries items from machine A to machine B, it will take time τ; when it is back from machine B to machine A, it will take zero time. And there is an unlimited buffer on each machine to store jobs that will be processed. The objective is to minimize the completion time on machine B. The complexity of the problem is open in Journal of Scheduling 2001 [5]. We prove the problem is NP-hard in the strong sense by 4-partition problem. © 2015 Elsevier B.V.

Pre One:A Credit-Based Load-Balance-Aware CTA Scheduling Optimization Scheme in GPGPU

Next One:Computing Framework of Large-scale Dilated Polyhedral DEM Particles Simulation Based on GPU

Profile

教育背景:

  • 学士学位:吉林大学计算机系,1982

  • 硕士学位:大连理工大学计算机系,1989

科研与工作经历:

  • 198610月—198710月,新西兰Progeni Company,访问学者

  • 199010月—199212月,德国PDI Karlsruhe University计算机系,访问学者

  • 199212月—200712月,大连理工大学计算机系,副教授

  • 19953月—19966月,大连市金卡工程系统,总工程师

  •  

  • 20081月—今,大连理工大学软件学院,教授

  • 20204 退休

教学工作:

  • 1992年—2007年,计算机导论,计算机组织与结构,计算机系统结构

  • 2009年—2019年,存储技术,计算机系统结构,并行计算

科研:

  • 研究兴趣:并行与分布式计算。