Chen Jianyun
Professor Supervisor of Doctorate Candidates Supervisor of Master's Candidates
Gender:Male
Alma Mater:大连理工大学
Degree:Doctoral Degree
School/Department:水利工程系
Discipline:Hydraulic Structure Engineering. Disaster Prevention & Mitigation Engineering. Structural Engineering. Project Management
Contact Information:QQ:593001776
E-Mail:eerd001@dlut.edu.cn
Hits:
Indexed by:会议论文
Date of Publication:2009-09-20
Included Journals:EI、Scopus
Abstract:There are many difficulties in top-down earthwork construction, such as great difficulty in excavation, long time in construction and the diversity and complexity in arranging machine, etc. Cyclic operation network (CYCLONE) apply queueing theory and simulation technique to network planning technique, through the simulation of cyclic construction process and stochastic process, provide complete decision-making for cyclic construction process. It is acceptable for the analysis and resource optimization of cyclic construction process. This paper grasps the key factors in performing top-down earthwork construction, applies CYCLONE in the process. Subject to the characteristics and corresponding construction process of top-down earthwork construction, nodes with different type and functions were set to fulfill the different tasks in simulation, and then reasonable CYCLONE was build. At last computer simulation technique was used to simulate the whole construction process. And different simulation result for different machine arrangement plan was got. By the analysis of different simulation result, we can make choice of the best machine arrangement plan. This method is helpful for the construction organization planning of top-down earthwork project. ?2009 IEEE.
2004 -博士生导师,大连理工大学土木水利学院
2006- 教授,大连理工大学土木水利学院
2007- 2008 研究生院副院长
2009 - 2014 建设工程学部水利学院 副院长
1999 -2004 副教授,大连理工大学土木水利学院 ,工程抗震研究所副所长