Finite element simulation of bone remodelling in human mandible around osseointegrated dental implant
Release time:2019-03-11
Hits:
Indexed by:期刊论文
First Author:Liu, G.
Correspondence Author:Liu, GL (reprint author), Univ Sci & Technol Liaoning, Sch Sci, Anshan 114051, Peoples R China.
Co-author:Zhao, J.,Wang, W.
Date of Publication:2011-09-16
Journal:Advanced Materials Research
Included Journals:EI、CPCI-S、Scopus
Document Type:J
Volume:314-316
Page Number:2008-2011
ISSN No.:9783037852156
Key Words:Production-inventory planning; Petroleum industry; Mixed integer
programming
Abstract:This research deals with the multi-level capacitated lot-sizing problem originating from the production system of a large typical oil refinery. A deterministic mixed integer programming model based on the minimization of setup, production, transportation and inventory costs is formulated to determine the production, inventory and transportation quantities in each time period under complicated material-balance and capacity constraints. A numerical example is subsequently provided to illustrate the broad applicability of the proposed model.
Translation or Not:no