中文

Understanding adoption of high off-site construction level technologies in construction based on the TAM and TTF

Hits:

  • Indexed by:Journal Papers

  • Document Code:358617

  • Date of Publication:2023-11-28

  • Journal:ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT

  • Volume:30

  • Issue:10

  • Page Number:4978-5006

  • ISSN:0969-9988

  • Key Words:ACCEPTANCE MODEL; CONCEPTUAL-MODEL; FIT MODEL; INTENTION; MODULAR CONSTRUCTION; PERFORMANCE CRITERIA; PLS-SEM; PREFABRICATED CONSTRUCTION; RESIDENTIAL BUILDINGS; SUSTAINABLE CONSTRUCTION


Address: No.2 Linggong Road, Ganjingzi District, Dalian City, Liaoning Province, P.R.C., 116024 Click:
  MOBILE Version

The Last Update Time:..

Open Time:..