副教授 博士生导师 硕士生导师
性别: 男
毕业院校: 大连理工大学
学位: 博士
所在单位: 建设管理系
学科: 工程管理
办公地点: 综合实验四号楼517室
电子邮箱: shjiang@dlut.edu.cn
开通时间: ..
最后更新时间: ..
点击次数:
论文类型: 期刊论文
发表时间: 2021-01-10
发表刊物: ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT
卷号: 27
期号: 10
页面范围: 3289-3308
ISSN号: 0969-9988
关键字: Building information modeling (BIM); Risk-factors; Interpretive structural model (ISM); Questionnaire survey
摘要: Purpose The purpose of this paper is to identify risk factors in building information modeling (BIM) technology application, analyze the correlation between risk factors, and find the most influential risk factors using interpretative structural model (ISM), put forward a response to targeted suggestions, and provide a reference for widespread BIM technology application. Design/methodology/approach Literature reviews, ISM, a questionnaire survey and expert interviews were used in this paper. First, the risk factors of BIM technology application and their relationships were determined by consulting the relevant BIM literature. Second, to more intuitively reflect the relationships between risk factors, an ISM model based on expert interviews was established to structure the explanatory relationships and hierarchical relationships between factors. Finally, a questionnaire survey was conducted for relevant practitioners, and a scale was designed to evaluate the risk factors of BIM technology application to determine the risk factors that have a greater impact on implementing BIM technology. Findings The root risk factors of BIM technology consist of unclear data ownership, incomplete standard BIM systems, lack of industry insurance, lack of BIM technicians, lack of BIM project practice experience, BIM infrastructure preparation, inconsistent thinking about BIM from project participants, changes in delivery mode and software function problems. Research limitations/implications The risk-sharing of BIM technology and the analysis of responsibilities, rights and benefits of all parties in a BIM project can be used as future research directions to solve higher management problems. Originality/value This paper describes the risks of BIM technology application for related researchers and provides another research train of thought for the follow-up studies.