DALIAN UNIVERSITY OF TECHNOLOGY
Login
中文
Home
Scientific Research
Research Projects
Published Books
Patents
Paper Publications
Research Field
Teaching Research
Teaching Achievement
Teaching Information
Teaching Resources
Awards and Honours
Other Rewards
Academic Honor
Scientific Awards
Enrollment Information
Student Information
My Album
Blog
Current position:
Home
>>
Scientific Research
>>
Paper Publications
JIANJUN WANG
Personal Information
Professor Supervisor of Doctorate Candidates Supervisor of Master's Candidates
Paper Publications
[51]Wang J., Rong L..Evolving model of emergency planning system in China[A],2013,8041 LNAI:280-288
[52]Wang, Xiao-Yuan, Jian-Jun, XY (reprint author), Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China..Single-machine due date assignment problem with deteriorating jobs and resource-dependent proce...[J],INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY,2013,67(1-4,SI):255-260
[53]Wang, Xiao-Yuan, Jian-Jun, XY (reprint author), Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China..Scheduling problems with past-sequence-dependent setup times and general effects of deteriorati...[J],APPLIED MATHEMATICAL MODELLING,2013,37(7):4905-4914
[54]Wang, Ji-Bo, Jian-Jun, JB (reprint author), Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China..Scheduling jobs with a general learning effect model[J],APPLIED MATHEMATICAL MODELLING,2013,37(4):2364-2373
[55]Wang, Xue-Ru, Jian-Jun, XR (reprint author), Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China..Single-machine scheduling with convex resource dependent processing times and deteriorating job...[J],APPLIED MATHEMATICAL MODELLING,2013,37(4):2388-2393
[56]Wang, Ji-Bo, Jian-Jun, JB (reprint author), Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China..Single-machine scheduling with precedence constraints and position-dependent processing times[J],APPLIED MATHEMATICAL MODELLING,2013,37(3):649-658
[57]Wang, J-J, J-B, Liu, F., JB (reprint author), 37 Daoyi S Ave, Shenyang 110136, Peoples R China..Parallel machines scheduling with a deteriorating maintenance activity[J],JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY,2011,62(10):1898-1902
[58]Wang, J-B, J-J, Ji, P., JB (reprint author), Shenyang Aerosp Univ, Sch Sci, Operat Res & Cybernet Inst, Shenyang 110136, Peoples R China..Scheduling jobs with chain precedence constraints and deteriorating jobs[J],JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY,2011,62(9):1765-1770
[59]Wang, Ji-Bo, Jian-Jun, JJ (reprint author), Dalian Univ Technol, Sch Management Sci & Engn, Dalian 116024, Peoples R China..Single-machine scheduling jobs with exponential learning functions[J],COMPUTERS & INDUSTRIAL ENGINEERING,2011,60(4):755-759
[60]Wang, Li-Yan, Jian-Jun, Ji-Bo, Feng, En-Min, LY (reprint author), Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China..Scheduling jobs with general learning functions[J],JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING,2011,20(1):119-125
total60 6/6
first
previous
next
last
Page