林林
开通时间:..
最后更新时间:..
点击次数:
论文类型:会议论文
发表时间:2015-07-21
收录刊物:EI、CPCI-S、Scopus
卷号:362
页面范围:3-25
关键字:Hybrid genetic algorithms (HGA); Multiobjective HGA (Mo-HGA); Manufacturing scheduling; Parallel machines scheduling (PMS); Hard disc device (HDD)
摘要:In real world manufacturing systems there are many combinatorial optimization problems (COP) imposing on more complex issues, such as complex structure, nonlinear constraints, and multiple objectives to be handled simultaneously. Manufacturing scheduling is one of the important and complex COP models, where it can have a major impact on the productivity of a production process. Moreover, the COP models make the problem intractable to the traditional optimization techniques because most of scheduling problems fall into the class of NP-hard combinatorial problems. In order to develop effective and efficient solution algorithms that are in a sense good, i.e., whose computational time is small as within 3min, or at least reasonable for NP-hard combinatorial problems met in practice, we have to consider: quality of solution, computational time and effectiveness of the nondominated solutions for multiobjective optimization problem (MOP). When solving any NP-hard problem, a genetic algorithm (GA) based on principles from evolution theory is most powerful metaheuristics. In this paper, we concern with the design of hybrid genetic algorithms (HGA) and multiobjective HGA (Mo-HGA) to solve manufacturing scheduling problems. Firstly we introduce typical models in manufacturing scheduling systems such as parallel machines scheduling (PMS), flexible job-shop scheduling problem (FJSP) and assembly line balancing (ALB) problem. Secondly to solve NP-hard COP models, we introduce design scheme of HGA combined with fuzzy logic controller (FLC) and multi objective HGA (Mo-HGA) with several fitness assignment mechanisms. For demonstrating computational experiments by HGA and Mo-HGA, the effectiveness of the HGA for the HDD (hard disc device) and Mo-HGA for TFT-LCD (thin-film transistor-liquid crystal display) module assembly problems as a practical manufacturing model, respectively is demonstrated in the concatenated paper Part II.