个人信息Personal Information
副教授
硕士生导师
任职 : 辽宁省工程建设评标专家、辽宁省公路学会会员
性别:男
毕业院校:大连理工大学
学位:博士
所在单位:交通运输系
学科:道路与铁道工程. 市政工程
办公地点:大连理工大学 综合实验4号楼 534室
电子邮箱:liwo@dlut.edu.cn
Specimen Molding Method of Chip Seal in Laboratory
点击次数:
论文类型:会议论文
发表时间:2011-09-22
收录刊物:EI、CPCI-S、Scopus
卷号:374-377
页面范围:1904-1907
关键字:Chip seal; Asphalt pavement; Specimen molding method; Laboratory simulation test
摘要:Chip seal is most frequently used as preventive maintenance (PM) treatments on asphalt pavement. However, it's difficult to make the performance test of chip seal in laboratory. In this paper, the specimen molding method of chip seal is established in laboratory. Firstly, considering the structure and technique condition of the original pavement, a cushion layer of asphalt concrete (AC) is used as under layer of the specimen. Secondly, the construction process of chip seal is simulated in laboratory, which includes spraying emulsified asphalt and/or glass fiber, spreading aggregate, initial rolling and conservation, post-stage rolling and conservation in interval for some time. Lastly, visual inspection and sand patch test are used to evaluate the quality of the specimen. Research results show that the method of specimen molding and test in laboratory could relatively accurately simulate, evaluate and forecast the performance of the chip seal.