location: Current position: Home >> Scientific Research >> Paper Publications

A Three-Stage Birandom Program for Unit Commitment with Wind Power Uncertainty

Hits:

Indexed by:期刊论文

Date of Publication:2014-07-01

Journal:SCIENTIFIC WORLD JOURNAL

Included Journals:SCIE、PubMed、Scopus

Volume:2014

Page Number:583157

ISSN No.:1537-744X

Abstract:The integration of large-scale wind power adds a significant uncertainty to power system planning and operating. The wind forecast error is decreased with the forecast horizon, particularly when it is from one day to several hours ahead. Integrating intraday unit commitment (UC) adjustment process based on updated ultra-short term wind forecast information is one way to improve the dispatching results. A novel three-stage UC decision method, in which the day-ahead UC decisions are determined in the first stage, the intraday UC adjustment decisions of subfast start units are determined in the second stage, and the UC decisions of fast-start units and dispatching decisions are determined in the third stage is presented. Accordingly, a three-stage birandom UC model is presented, in which the intraday hours-ahead forecasted wind power is formulated as a birandom variable, and the intraday UC adjustment event is formulated as a birandom event. The equilibrium chance constraint is employed to ensure the reliability requirement. A birandom simulation based hybrid genetic algorithm is designed to solve the proposed model. Some computational results indicate that the proposed model provides UC decisions with lower expected total costs.

Pre One:三种弃风消纳方案的节煤效果与国民经济性比较

Next One:配置储热后热电机组调峰能力分析