Current position: Home >> Scientific Research >> Paper Publications

Dynamic response analysis of the installation system during hoisting and mating phases using a floating vessel. Part I: Model formulation and verification

Release Time:2026-07-24  Hits:

Indexed by: Journal Papers

Document Code: 593981

Date of Publication: 2025-08-15

Journal: MARINE STRUCTURES

Volume: 103

ISSN: 0951-8339

Key Words: BLADE INSTALLATION; CRANE; OFFSHORE

Prev One:Gradient-based model predictive control for energy capture optimization of oscillating buoy wave energy converters

Next One:波浪能浮子与半潜式风机基础的耦合作用