个人信息Personal Information
副教授
博士生导师
硕士生导师
性别:男
毕业院校:大连理工大学
学位:博士
所在单位:水利工程系
学科:水文学及水资源. 水利水电工程
办公地点:大连理工大学 综合实验3#楼 518室 (主楼后面)
联系方式:shengliliao@dlut.edu.cn
电子邮箱:shengliliao@dlut.edu.cn
Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch
点击次数:
论文类型:期刊论文
发表时间:2009-12-01
发表刊物:ENERGY CONVERSION AND MANAGEMENT
收录刊物:SCIE、EI、Scopus
卷号:50
期号:12
页面范围:3007-3014
ISSN号:0196-8904
关键字:Particle swarm optimization; Dynamic programming algorithm; Unit load dispatch; Optimization techniques; Large scale
摘要:Dynamic programming (DP) is one of classic and sophisticated optimization methods that have successfully been applied to solve the problem of hydro unit load dispatch (HULD). However, DP will be faced with the curse of dimensionality with the increase of unit number and installed generating capacity of hydropower station. With the appearance of the huge hydropower station similar to the Three George with 26 generators of 700 MW, it is hard to apply the DP to large scale HULD problem. it is crucial to seek for other optimization techniques in order to improve the operation quality and efficiency. Different with the most of literature about power generation scheduling that focused on the comparisons of novel PSO algorithms with other techniques, the paper will pay emphasis on comparison study of PSO with DP based on a case hydropower station. The objective of study is to seek for an effective and feasible method for the large scale of hydropower station of the current and future in China. This paper first compares the performance of PSO and DP using a sample load curve of the Wujiangdu hydropower plant located in the upper stream of the Yangtze River in China and contained five units with the installed capacity of 1250 MW. Next, the effect of different load interval and unit number on the optimal results and efficiency of two methods has also been implemented. The comparison results show that the PSO is feasible for HULD. Furthermore, we simulated the effect of the magnitude of unit number and load capacity on the optimal results and cost time. The simulation comparisons show that PSO has a great advantage over DP in the efficiency and will be one of effective methods for HULD problem of huge hydropower stations. Crown Copyright (C) 2009 Published by Elsevier Ltd. All rights reserved.