申建建
个人信息Personal Information
教授
博士生导师
硕士生导师
性别:男
毕业院校:大连理工大学
学位:博士
所在单位:水利工程系
学科:水文学及水资源. 水利水电工程
办公地点:大连理工大学综合实验3号楼427(主楼后面)
联系方式:办公电话:0411-84708468 通讯地址:辽宁大连高新园区凌工路2号大连理工大学综合实验3号楼427 邮政编码:116024
电子邮箱:shenjj@dlut.edu.cn
扫描关注
- [41]申建建, 陆建宇, 吴慧军, 程雄, 程春田.区域电网水火电系统短期协调控制方法及应用实践[J],电力自动化设备,2016,36(10):141-147
- [42]李保健, 武新宇, 申建建, Shen, J., Institute of Hydropower, Hydroinformatics, Dalian University of TechnologyChina, email: shenjj@dlut.edu.en.考虑滞时电量的水电中期调度拉格朗日松弛方法[J],水利水电科技进展,2016,36(4):59-64
- [43]Shen, Jianjian, Cheng, Chuntian, JJ (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian, Peoples R China..A hybrid method for multi-objective hydropower system operation[J],PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MANAGEMENT,2016,169(3):115-127
- [44]Shen, Jianjian, Cheng, Chuntian, Xiong, Lund, Jay R., CT (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Coordinated operations of large-scale UHVDC hydropower and conventional hydro energies about re...[J],ENERGY,2016,95:433-446
- [45]申建建.特高压交直流混联电网中短期协调调度方法[A],2016
- [46]申建建.特高压直流互联跨流域水电站群联合优化调度方法[A],2016
- [47]申建建, 程春田.特高压直流送端水电与受端气电短期协调优化方法[A],2016
- [48]牛文静, 申建建, 程春田, 武新宇, 冯仲恺, 郭有安.耦合调峰和通航需求的梯级水电站多目标优化调度混合搜索方法[J],中国电机工程学报,2016,36(9):2331-2341
- [49]冯仲恺, 程春田, 牛文静, 廖胜利, 申建建, Cheng, Chuntian(ctcheng@dlut.edu.cn).均匀动态规划方法及其在水电系统优化调度中的应用[J],水利学报,2015,46(12):1487-1496
- [50]李树山, 李崇浩, 唐红兵, 申建建, 朱亮.多振动区水电站短期调峰负荷分配方法[J],南方电网技术,2015,9(8):77-82
- [51]Cheng, Chun-tian, Niu, Wen-jing, Feng, Zhong-kai, Shen, Jian-jian, Chau, Kwok-wing, CT (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Daily Reservoir Runoff Forecasting Method Using Artificial Neural Network Based on Quantum-beha...[J],WATER,2015,7(8):4232-4246
- [52]吴慧军, 程春田, 陆建宇, 励刚, 申建建.网省两级调度多电源短期联合调峰方法[J],中国电机工程学报,2015,35(11):2743-2755,后插13
- [53]Wu Xin-Yu, Cheng Chun-Tian, Shen Jian-Jian, Luo Bin, Liao Sheng-Li, Li Gang, Cheng, CT (reprint author), Dalian Univ Technol, Fac Infrastruct Engn, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..A multi-objective short term hydropower scheduling model for peak shaving[J],INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,2015,68:278-293
- [54]Wang Jian, Wu Huijun, Shen Jianjian, Cheng Chuntian, Luo Qingbiao.Simulation based optimal practical trajectory for reservoir operation[A],2015,1944-1951
- [55]Feng Z., Liao S., Niu W., Su H., Wang M., Cheng C., Shen J..Orthogonal dimension reduction search algorithm for optimal operation of hydropower systems[A],2015,1923-1931
- [56]Cheng, Chun-Tian, Xiong, Shen, Jian-Jian, Wu, Xin-Yu, CT (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Short-term peak shaving operation for multiple power grids with pumped storage power plants[J],INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,2015,67:570-581
- [57]冯仲恺, 廖胜利, 李泽宏, 牛文静, 申建建, 程春田, Cheng, Chuntian.改进量子粒子群算法在水电站群优化调度中的应用[J],水科学进展,2015,26(3):413-422
- [58]程春田, 励刚, 程雄, 申建建, 陆建宇, Cheng, Chuntian(ctcheng@dlut.edu.cn).大规模特高压直流水电消纳问题及应用实践[J],中国电机工程学报,2015,35(3):549-560
- [59]程雄, 程春田, 申建建, 励刚, 陆建宇, Cheng, Xiong.大规模跨区特高压直流水电网省两级协调优化方法[J],电力系统自动化,2015,39(1):151-158,232
- [60]申建建, 程春田.A Generalized Decision Support System for Short-Term Scheduling of China’s Big hydropower system[A],2015