location: Current position: Home >> Scientific Research >> Paper Publications

地震液化灾害自适应步长计算方法及控制参数研究

Hits:

Date of Publication:2022-10-10

Journal:岩土工程学报

Issue:10

Page Number:1833-1841

ISSN No.:1000-4548

Abstract:Seismic liquefaction of saturated soil is a serious problem in the area of geotechnical earthquake engineering. In the numerical analysis of dynamic process, calculation accuracy and efficiency are the two important indexes to evaluate the numerical method. An adaptive time stepping method is proposed based on a solid-fluid coupled method and an elasto-plastic analysis platform. According to the estimation system of displacement errors, pore water pressure errors and mixed errors, the strategy of time step adjustment and the relevant control parameters are established. Through the sensitivity analysis of control parameters, the error tolerance and proportionality coefficient of pore water pressure errors are identified as the main control parameters, while the initial time step size, lower and upper limits of time step adjustment factor are identified as the assistant parameters. Then, the adaptive stepping method is applied in the numerical analysis of a subway station located in the liquefiable area. The time histories of the uplift displacement and the excess pore water pressure ratio are obtained, which indicates the hazards of underground structure uplift induced by seismic liquefaction. Besides, the fixed stepping and adaptive stepping methods are compared, and it is found thatusingthe adaptive stepping method can save more computational cost without losing the accuracy.

Note:新增回溯数据

Pre One:含倾斜砂土夹层的人工岛地震液化灾害分析

Next One:土坝的地震响应及液化无网格法分析