王峥峥

个人信息Personal Information

教授

博士生导师

硕士生导师

性别:男

毕业院校:西南交通大学

学位:博士

所在单位:土木工程系

学科:桥梁与隧道工程. 防灾减灾工程及防护工程

办公地点:桥隧研发基地

联系方式:0411-84707232-8203

电子邮箱:wangzhengzheng@dlut.edu.cn

扫描关注

论文成果

当前位置: 中文主页 >> 科学研究 >> 论文成果

Analysis of the displacement increment induced by removing temporary linings and corresponding countermeasures

点击次数:

论文类型:期刊论文

发表时间:2018-03-01

发表刊物:TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY

收录刊物:ESI高被引论文、SCIE、EI

卷号:73

页面范围:236-243

ISSN号:0886-7798

关键字:Temporary lining; Preliminary lining; Bedded-beam model; Maximum settlement increment (MSI); Countermeasure grading

摘要:Temporary shotcrete lining plays an important role in stabilizing tunnel structures. However, demolition of the temporary lining has negative impacts on the preliminary lining. Based on a case study of using pre-tensioned anchor cables to minimize the risk caused by removing temporary linings, a comprehensive study has been carried out on the displacement caused by removing temporary linings as well as countermeasures. A calculation model was established based on a bedded-beam model recommended by the International Tunneling Association (ITA). Using this model, the influences of three factors, the axial force in the temporary lining, the thickness of the preliminary lining and the deformation modulus of the ground, were studied in detail. Countermeasures were proposed corresponding to each of the influence factors and a countermeasure grading system was constructed. The research results presented in this paper can be valuable references for design and construction of tunnels involving use of temporary linings.