location: Current position: Home >> Scientific Research >> Paper Publications

Application of the Work Study to Balancing Hydraulic Component Assembly Lines

Hits:

Indexed by:会议论文

Date of Publication:2011-12-08

Included Journals:EI、CPCI-S、Scopus

Volume:452-453

Page Number:206-210

Key Words:work research; method research; work measurement; balance of assembly line

Abstract:This paper applies the methods of Work Study to a certain hydraulic component company. We apply the work measurement method to measure the work time of various stations of assembly lines, and to find out both the bottle neck stations and the superfluous capability stations effecting on the line assembly capability. Basing on the principle of ECRS (Eliminate, Combine, Rearrange, Simple) and the line balancing theory, this paper provides the line balancing schema, including the improvement of the existing equipment, the reallocation of the work content for relative stations, the adjustment of the equipment and workers of some stations, the reduction of machine working time of some stations and the change of assembly line layout etc. After being improved, the work time of the bottle neck and other processes are controlled near the Taking Time. Comparing with the former assembly line, the production capability of assembly line improved up 45.6% and workshop condition is also improved.

Pre One:Collaborative production planning of supply chain under price and demand uncertainty

Next One:组织内部员工的信息安全非胜任特征的评价指标与方法