扫描手机二维码

欢迎您的访问
您是第 位访客

开通时间:..

最后更新时间:..

  • 王建军 ( 教授 )

    的个人主页 http://faculty.dlut.edu.cn/wjj/zh_CN/index.htm

  •   教授   博士生导师   硕士生导师
论文成果 当前位置: 中文主页 >> 科学研究 >> 论文成果
Single machine common flow allowance scheduling with deteriorating jobs and a rate-modifying activity

点击次数:
论文类型:期刊论文
发表时间:2014-12-01
发表刊物:APPLIED MATHEMATICAL MODELLING
收录刊物:SCIE、EI
卷号:38
期号:23
页面范围:5431-5438
ISSN号:0307-904X
关键字:Scheduling; Single machine; Rate-modifying activity; Deteriorating jobs; SLK due date assignment
摘要:We study a single machine slack due date assignment (usually referred to as SLK) scheduling problem with deteriorating jobs and a rate-modifying activity. The deterioration effect manifest such that the job processing time is a function of its starting time in a sequence. The rate-modifying activity is an activity that changes the processing rate of machine, i.e., the machine performs a rate-modifying activity. Hence the actual processing time of a job is a variable, which depends not only on its starting time in a sequence but also on whether it is scheduled before or after a rate-modifying activity. The goal is to schedule the rate-modifying activity, the optimal common flow allowance and the sequence of jobs to minimize the total earliness, the total tardiness and the common flow allowance cost. We show that the problem remains polynomially solvable under the proposed model. (C) 2014 Elsevier Inc. All rights reserved.

 

辽ICP备05001357号 地址:中国·辽宁省大连市甘井子区凌工路2号 邮编:116024
版权所有:大连理工大学