教授 博士生导师 硕士生导师
性别: 女
毕业院校: 大连理工大学
学位: 博士
所在单位: 水利工程系
学科: 港口、海岸及近海工程
办公地点: 综合实验3#楼407室
联系方式: 0411-84707174
电子邮箱: wangwenyuan@dlut.edu.cn
开通时间: ..
最后更新时间: ..
点击次数:
发表时间: 2022-10-09
发表刊物: 哈尔滨工程大学学报
所属单位: 建设工程学部
期号: 12
页面范围: 1520-1523,1599
ISSN号: 1006-7043
摘要: While focusing on the determination of the number of flat containers in port , on the basis of the analysis of the loading and unloading process , considering different types of containers , handling technology , unit space cost and the income of the yard , a two-stage stochastic programming model with compensation matrix was established .In the model ,the yard maximum profits and maximum number of containers per day at the yard were considered as the target and random variable respectively .To solve the required yard capacity and therefore determine the number of flat containers , the maximum profit was considered as the target at the first stage , and the minimum penalty func-tion was considered as the target at the second stage .The results taken from an example showed that the outcome from the two-stage stochastic programming is less than that derived from the standard .Through the analysis of the example , we were able to draw the conclusion that the two-stage stochastic programming can effectively reduce the impact of uncertainties , save costs of land resources , increase the income of the yard , and decrease handling tech-nology costs to obtain the optimal number of flat containers .
备注: 新增回溯数据