大型半潜式起重船坞内建造整体合拢方案论证

Release Time:2019-05-06  Hits:

Indexed by: Journal Article

Date of Publication: 2019-02-25

Journal: 船海工程

Volume: 48

Issue: 1

Page Number: 13-17

ISSN: 1671-7953

Key Words: 半潜式起重船;整体合拢;顶升;滑移

Abstract: 针对大型半潜式船舶自下而上建造周期长及船台和船坞利用率低下等问题,以某半潜式起重铺管船坞内建造为例,提出基于上组块顶升、下组块滑移的大型半潜式起重铺管船坞内建造整体合拢方案,基于有限元方法计算支墩和顶升底座承重大小,校核坞底最大承载力,验证合拢方案可行性.

Prev One:基于CBCT图像的颌骨及牙列有限元建模方法研究

Next One:Numerical research on the anti-sloshing effect of a ring baffle in an independent type C LNG tank