周惠成

个人信息Personal Information

教授

博士生导师

硕士生导师

性别:男

毕业院校:大连理工大学

学位:博士

所在单位:水利工程系

学科:水文学及水资源. 工程管理

办公地点:实验3#-435

联系方式:电话:13804245837 QQ:2246578293 微信:dutwaterzhou

电子邮箱:hczhou@dlut.edu.cn

扫描关注

论文成果

当前位置: 中文主页 >> 科学研究 >> 论文成果

Optimization Operation Model Coupled with Improving Water-Transfer Rules and Hedging Rules for Inter-Basin Water Transfer-Supply Systems

点击次数:

论文类型:期刊论文

发表时间:2015-08-01

发表刊物:WATER RESOURCES MANAGEMENT

收录刊物:EI、SCIE、Scopus

卷号:29

期号:10

页面范围:3787-3806

ISSN号:0920-4741

关键字:Inter-basin water transfer; Multi-reservoir operation; Improving water-transfer rule; Hedging rule; Parallel PSO algorithm

摘要:Due to the great complexity and the nonlinear and dynamic characteristics of joint optimization operations in inter-basin water transfer-supply systems (IBWTS), rational operating rules (water-transfer rules and hedging rules) are essential in water resources management at the planning stage. Currently, the water-transfer rules in optimization operation model are not reasonable as there is only one water-transfer rule curves for each recipient reservoir, so that they cannot reflect the refined water transfer especially when there is a small water shortage. Therefore, the purpose of this study is mainly to develop new water-transfer rules to improve the effectiveness of water transfer. That is, upper-and-lower water-transfer rule curves for each recipient reservoir and one water-transfer rule curve for one donor reservoir are developed to make water-transfer decisions. In the proposed rule, water transfer involves a combined decision-making process in consideration of water storages of both the recipient and donor reservoirs. Most importantly, when there is less water shortage in recipient reservoirs, the actual transferred water is no more than the water flow interpolated within the designed delivery capacity instead of only the designed delivery capacity in other existing rules. Because it is an interactive process of water transfer and water supply in the IBWTS operations, operation models coupled with the improving water-transfer rules and hedging rules are established for solving the operation problems. Finally, a North-line IBWTS located in Liaoning Province in China is employed as a case study. And a coarse-grained parallel PSO algorithm with a simulation model is employed for effectively deriving the operating rule curves (water-transfer and hedging rule curves). The operation results show that the proposed rule-based operation model are reasonable and can significantly reduce water transfer with less influence on the water-supply capability than other existing operating rules.