唐春安

个人信息Personal Information

教授

博士生导师

硕士生导师

主要任职:President of international exchange committee of the Chinese Society of Rock Mechanics and Engineering CSRME

其他任职:国际岩石力学与岩石工程学会(ISRM)中国国家小组副主席

性别:男

毕业院校:东北大学

学位:博士

所在单位:土木工程系

办公地点:综合实验四号楼330

联系方式:tca@mail.neu.edu.cn

扫描关注

论文成果

当前位置: 中文主页 >> 科学研究 >> 论文成果

Study and Apply Rolling Predictive Control Model for Surrounding Rock Displacement Based on PSO-SVM

点击次数:

论文类型:会议论文

发表时间:2008-07-02

收录刊物:EI、CPCI-S、Scopus

页面范围:1843-1847

关键字:Underground engineer; Particle swarm optimization; Support vector machine; Predictive control; Surrounding rock displacement

摘要:The excavation and construction of underground engineering is a dynamically adjusting process of system. The paper starts with the index of surrounding rock displacement which can reflect both observability and controllability of underground engineer system. The nonlinear machine learning tool -Support Vector Machine(SVM) which based on statistic learning theory is utilized to construct the time series model. Because penalty factor and kernel parameter of SVM affect the predicting accuracy evidently, and SVM has not provided the selection method, the parameters are optimized by global optimization arithmetic-particle swarm optimization. Based on the PSO-SVM evolutionary predictive model, appending the up-to-date monitoring information, multi-step extrapolating forecast model of surrounding rock displacement is constructed, and according to control criteria, the supporting scheme is adjusted, realizing the predictive control for underground engineer. An engineer sample is studied, the result states that the PSO-SVM model is feasible. The proposed predictive control method provides new approach for underground construction.