location: Current position: Home >> Scientific Research >> Paper Publications

Scheduling of short-term hydrothermal energy system by parallel multi-objective differential evolution

Hits:

Indexed by:期刊论文

Date of Publication:2017-12-01

Journal:APPLIED SOFT COMPUTING

Included Journals:Scopus、SCIE、EI

Volume:61

Page Number:58-71

ISSN No.:1568-4946

Key Words:Hydrothermal scheduling; Multi-objective differential evolution; Parallel computing; Fork/Join framework; Constraint handling method

Abstract:With the growing concerns on energy and environment, the short-term hydrothermal scheduling (SHTS) which minimizes the fuel cost and pollutant emission simultaneously is playing an increasing important role in the modern electric power system. Due to the complicated operation constraints and objectives, SHTS is classified as a multi-objective optimization problem. Thus, to efficiently resolve this problem, this paper develops a novel parallel multi-objective differential evolution (PMODE) combining the merits of parallel technology and multi-objective differential evolution. In PMODE, the population with larger size is first divided into several smaller subtasks to be concurrently executed in different computing units, and then the main thread collects the results of each subpopulation to form the final Pareto solutions set for the SHTS problem. During the evolutionary process of each subpopulation, the mutation crossover and selection operators are modified to enhance the performance of population. Besides, an external archive set is used to conserve the Pareto solutions and provide multiple evolutionary directions for individuals, while the constraint handling method is introduced to address the complicated operational constraints. The results from a mature hydrothermal system indicate that when compared with several existing methods, PMODE can obtain satisfactory solutions in both fuel cost and environmental pollutant, which is an effective tool to generate trade-off schemes for the hydrothermal scheduling problem. (C) 2017 Elsevier B.V. All rights reserved.

Pre One:快速响应负荷需求的大规模水电站群超短期调度模型

Next One:Multiobjective Operation Optimization of a Cascaded Hydropower System