location: Current position: Home >> Scientific Research >> Paper Publications

Short-Term Hydroscheduling with Discrepant Objectives Using Multi-Step Progressive Optimality Algorithm

Hits:

Indexed by:期刊论文

Date of Publication:2012-06-01

Journal:JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION

Included Journals:EI、SCIE、Scopus

Volume:48

Issue:3

Page Number:464-479

ISSN No.:1093-474X

Key Words:short-term hydroscheduling; discrepant objectives; progressive optimality algorithm; multi-step progressive optimality algorithm

Abstract:Cheng, Chuntian, Jianjian Shen, Xinyu Wu, and Kwok-wing Chau, 2012. Short-Term Hydroscheduling with Discrepant Objectives Using Multi-step Progressive Optimality Algorithm. Journal of the American Water Resources Association (JAWRA) 48(3): 464-479. DOI: 10.1111/j.1752-1688.2011.00628.x Abstract: With increase in the number and total capacity of hydropower plants in power systems, optimality algorithms with a single objective are not suitable for optimizing the operation of complex hydropower systems to meet complex demands. Hydropower plants should prioritize discrepant objectives, such as peak regulation and maximizing generation during solving of optimal operation problems of hydropower systems. In this article, we present a multi-step progressive optimality algorithm (MSPOA) for the short-term hydroscheduling (STHS) problem to improve the quality of optimal solutions and enhance the convergence speed of progressive optimality algorithm (POA). In MSPOA, the original problem is first decomposed into a sequence of problems with the longer time steps. Next, the problem with the longest time step is solved, and the optimal solution is used as the initial solution for the problem with the second longest time step. This process proceeds until the original problem with the shortest time step is solved. The proposed discrepant-objective method and solution technique are tested for two types of hydroelectric systems. The results show that MSPOA can give better solutions and cost less time than POA due to enlarging feasible range of decision variables and reducing the number of computational stages. Discrepant objectives among hydropower plants can express the operation characteristics of complex hydropower systems more accurately than unique objective or multiple objectives.

Pre One:Operation challenges for fast-growing China's hydropower systems and respondence to energy saving and emission reduction

Next One:Hybrid PSO algorithm with tabu search for hydro unit commitment